NEW: the ISO 14001:2026, ISO/IEC 17020:2026 and FSSC 22000 V7 documentation kits are now available.
OEM requirement: IATF 16949 certification is expected to enter the supply chain of major automakers (Ford, GM, Stellantis, BMW, VW, Mercedes-Benz).
Documentation kit · IATF 16949:2016

Your IATF 16949 documentation, without starting from scratch.

Word and Excel templates to structure your automotive QMS, deploy the Core Tools and prepare the certification audit.

  • Sections 4 to 10, automotive requirements and CSRs
  • Core Tools: APQP, PPAP, FMEA, SPC, MSA
  • 148 editable files and a requirement mapping
  • OEM requirement: certification expected to join automaker supplier panels
Buy the kit · $389
Single-site licenseInstant download30-day money-back guarantee
IATF 16949:2016 documentation kit
148
Documents included
7
Requirement sections, 4 to 10
5
Core Tools integrated
100%
Requirements mapped
Who this kit is for

Designed for organizations supplying the automotive industry.

Four profiles, one need: an IATF 16949 documentation base ready to adapt.

OEM suppliers and Tier 1

Direct suppliers to automakers, subject to IATF 16949 and each customer's specific requirements.

Tier 1OEM CSRs

Tier 2 and Tier 3 suppliers

Components, sub-assemblies, production services: the requirement flows down through Tier 1.

Tier 2Tier 3Components

Certification candidates

ISO 9001 certified companies in transition, or new automotive sites to structure from day one.

ISO 9001 transitionNew site

Consultants and quality managers

A documentation base aligned with IATF sections and Core Tools, for engagements and in-house teams.

Client engagementsFirm license on request

What is in the kit

148 documents organized by IATF 16949:2016 section.

The kit covers sections 4 to 10 of IATF 16949:2016, the additional automotive requirements and the 5 Core Tools: APQP, PPAP, FMEA, SPC, MSA.

Master document list · IATF 16949:2016

Version 2.0, May 2026
148 documents · 98 Word · 50 Excel

Section 4 · Context of the organization

8 documents · Context and interested parties, QMS scope, process map, product safety, CSRs.
  • W
    Context and Interested Parties Analysis
  • W
    Product Safety Procedure
  • W
    CSR Identification and Management Procedure
  • W
    Annual PESTLE and SWOT Analysis Report
  • W
    Product Safety Officer Appointment and Quarterly Review Record
  • X
    Register of Interested Parties and Associated Requirements
  • W
    Automotive Process Map
  • W
    QMS Scope

Section 5 · Leadership

7 documents · Quality policy, roles and authorities, quarterly review, escalation, customer representative.
  • W
    Management Escalation Procedure
  • W
    Customer Representative Appointment Letter
  • W
    Management Escalation Record with Timelines and Resolution
  • W
    Quarterly Management Review Minutes
  • X
    Roles, Responsibilities, and Authorities
  • W
    Automotive Quality Policy
  • W
    Employee Responsibility Policy

Section 6 · Planning

9 documents · Risks and opportunities, preventive actions, business continuity plan, quality objectives, changes.
  • W
    Analysis of Risks and Opportunities
  • W
    Change Management Procedure
  • W
    Management-Level Change Request with Impact Analysis
  • W
    Business Continuity Plan
  • X
    Annual Business Continuity Plan Test Report
  • X
    Monthly Tracking of Quality Objectives with Trends
  • X
    Risks and Opportunities Matrix with Criticality and Action Plan
  • X
    Preventive Action Register
  • X
    Quality Objectives and Achievement Plans

Section 7 · Support

24 documents · Competence and training, auditors, TPM maintenance, metrology, MSA, documentation, customer standards.
  • W
    Competence, Training and Awareness Procedure
  • W
    Employee Motivation Procedure
  • W
    Document and Records Control Procedure
  • W
    Measuring Equipment Management Procedure
  • W
    Calibration and Measurement Traceability Procedure
  • W
    Alternative Measurement Methods, Customer Acceptance
  • W
    Customer Engineering Standards Management Procedure
  • W
    Change Distribution and Implementation Procedure
  • W
    Position-Based Competency Assessment Form
  • W
    Training Effectiveness Evaluation Record
  • W
    ISO 17025 Accredited External Laboratory Evaluation Form
  • W
    Out-of-Tolerance Instrument Form with Retroactive Impact Analysis
  • W
    Document Destruction Record at End of Retention
  • X
    Second-Party Auditor Competence Evaluation
  • X
    IATF Internal Auditor Competence Evaluation
  • X
    Calibration Certificate with SI Traceability
  • X
    Controlled Distribution List of External Customer Documents
  • X
    Detailed MSA Report by Instrument (R&R, bias, linearity, stability)
  • X
    Skills Matrix and Training Plan
  • X
    CSR Compliance Matrix by OEM
  • X
    Preventive and Predictive Maintenance Plan (TPM)
  • X
    Maintenance and Calibration Records
  • W
    Quality Manual
  • W
    Records Retention Policy

Section 8 · Customer requirements, APQP, design and FMEA

25 documents · 8.1 to 8.3: contract review, feasibility, APQP, design, special characteristics, FMEA.
  • W
    Contract and Requirements Review Procedure
  • W
    Customer Change Handling Procedure
  • W
    APQP Procedure, 5 Phases Including Process Design
  • W
    Product Design and Development Procedure
  • W
    Special Characteristics Identification Procedure (KPC KCC)
  • W
    FMEA Procedure (AIAG-VDA)
  • W
    Complete APQP File by Project
  • W
    Design Review Report with Actions
  • W
    Design Validation Plan and Report
  • W
    Design Verification Plan and Report
  • W
    Manufacturing Feasibility Study
  • W
    Annual FMEA Review Minutes Following Nonconformity or Change
  • W
    Embedded Software Development Self-Assessment
  • W
    Customer Change Notification Record with Acknowledgment and Impact
  • W
    Prototype Management Record with Prototype Control Plan
  • W
    Contract Review Report with Feasibility Checklist
  • W
    Design Review Report
  • X
    Traceable Customer Communication Log
  • X
    Completed Design FMEA with AP and Action Plan
  • X
    Process FMEA Completed by Product or Family
  • X
    S O D Rating Grid and Action Priority
  • X
    Product FMEA Template (Design FMEA)
  • X
    Process FMEA Template (Process FMEA)
  • X
    Customer Complaint Register
  • X
    Design Change Record

Section 8 · Supplier control

10 documents · 8.4: selection, evaluation, second-party audit, supplier development, IMDS.
  • W
    Supplier Selection and Qualification Procedure
  • W
    Statutory and Regulatory Purchasing Compliance Procedure
  • W
    Supplier Development Program (SDP) Procedure
  • W
    Second-Party Supplier Audit Report with Nonconformities
  • W
    Supplier Development Plan (SDP) with Milestones
  • W
    Supplier Evaluation and Qualification File
  • X
    IMDS Sheet and Regulated Substance Declaration by Supplier
  • X
    Quarterly Supplier Performance Dashboard
  • X
    Supplier Audit Checklist, Second-Party Audit
  • X
    Supplier Panel and Annual Evaluation

Section 8 · Production, changes and PPAP

26 documents · 8.5: control plan, work instructions, Run at Rate, traceability, customer property, changes, PPAP.
  • W
    Production and Service Provision Procedure
  • W
    Run at Rate Production Demonstration Procedure
  • W
    Lot Identification and Traceability Procedure
  • W
    Customer Property Management Procedure
  • W
    Production Change Control Procedure
  • W
    PPAP Procedure, 18 Elements
  • W
    Deviation and Concession Management Procedure
  • W
    PPAP Resubmission Procedure
  • W
    Change Record and Customer Approval
  • W
    Deviation and Concession Request with Documented Customer Acceptance
  • W
    Work Instructions Released to Workstation with Acknowledgment
  • W
    Process Change Notification with Customer Approval Before Implementation
  • W
    Complete PPAP Package per Part Number
  • W
    PPAP Resubmission Record with Reason and Result
  • W
    Product Preservation Record for Storage and Transport
  • W
    Standardized Work Instructions
  • X
    Customer-Owned Property Register (Tooling, Fixtures, Material) with Ownership Marking
  • X
    Signed Control Plan for Each Product Family
  • X
    Critical Production Information Sheet at Workstations (TPM, JIT, OEE)
  • X
    Customer-Signed PSW by Part Number
  • X
    Run at Rate Report with Rate and Quality Validation
  • X
    Traceability Test Sheet with Full Genealogy
  • X
    PPAP Package Compilation Checklist
  • X
    List of Alternative Inspection Methods
  • X
    PSW Form (Part Submission Warrant)
  • X
    Control Plan

Section 8 · Release and nonconformities

11 documents · 8.6 and 8.7: release, nonconformities, customer notification, rework, repair, recalls.
  • W
    Product and Service Release Procedure
  • W
    Nonconformity Management Procedure with Customer Notification
  • W
    Rework Procedure with Disposition
  • W
    Repair Procedure with Customer Authorization
  • W
    Recall Management Procedure
  • W
    Lot Release Form with Quality Validation
  • W
    Product Nonconformity Record with Disposition
  • W
    Formal Customer Notification of NC with Deadlines and Containment
  • W
    Annual Product Recall Exercise Report
  • W
    Repair Record with Prior Customer Authorization
  • W
    Rework Record with Quality-Approved Instruction

Section 9 · Performance evaluation

19 documents · SPC and capability, MSA and R&R, system, process and product audits, LPA, management review.
  • W
    SPC Statistical Process Control Procedure
  • W
    MSA Measurement System Analysis Procedure
  • W
    IATF Internal Audit Program and Procedure
  • W
    Layered Process Audit (LPA) Procedure
  • W
    Management Review Procedure with CSR Action Plan
  • W
    Internal Audit Report with NC, CA and Follow-up
  • W
    Process Audit Report with Turtle Diagram
  • W
    Product Audit Report
  • W
    Statistical Instability Management Record
  • W
    Management Review Minutes with 17 IATF Inputs and CSR Action Plan by OEM
  • X
    Triennial IATF Internal Audit Program Covering 100% of Processes
  • X
    Initial Capability Study Pp Ppk Before Series Production
  • X
    Monthly Continuous Cp Cpk Monitoring by Special Characteristic
  • X
    Completed Control Chart with Actions on Signals
  • X
    Daily LPA Sheet by Level (operator, supervisor, manager)
  • X
    R&R Report by Critical Instrument with Acceptance Verdict
  • X
    Capability Studies Cp Cpk Pp Ppk
  • X
    Control Charts
  • X
    Gage R&R Study: Gage Repeatability and Reproducibility

Section 10 · Improvement

7 documents · 8D, corrective actions and effectiveness, error-proofing, continual improvement.
  • W
    8D Problem-Solving Procedure
  • W
    Error-Proofing Poka-Yoke Procedure
  • W
    Continual Improvement Procedure
  • W
    8D Form with Customer Validation
  • W
    Corrective Action Form with 90-Day Effectiveness Verification
  • X
    Continuous Improvement Project Tracking with ROI
  • X
    Register of Installed Poka-Yokes with Periodic Validation

Audit and control

2 documents · IATF 16949:2016 audit checklist, 5 Core Tools manual with the IATF, ISO 9001 and Core Tools matrix.
  • W
    AIAG 5 Core Tools Manual and IATF ISO 9001 Core Tools Matrix
  • X
    IATF 16949 2016 Checklist
Full master document list, implementation checklist and one complete procedure in the free sample.
Why this kit exists

IATF 16949 cannot be drafted from a blank page.

The ISO 9001:2015 structure plus dense automotive requirements: APQP, PPAP, FMEA, MSA, SPC, CSRs.

ISO 9001 gap

ISO 9001 templates are not enough

They ignore PPAP, APQP, FMEA, control plans, series production and CSRs: most of the IATF differential.

Third-party audit

IATF audits are strict

Auditors qualified under IATF rules. A major nonconformity not closed on time can lead to certificate suspension.

OEM prerequisite

Automakers require IATF

Without valid certification, no nomination on new vehicle programs, then removal from the supplier panel.

$15,000 to $35,000

A consulting engagement is costly

20 to 60 consultant days depending on site size. The kit provides the written base, your budget goes to Core Tools on the floor.

Clause-by-clause mapping

Every IATF 16949 requirement → one document in the kit.

Section by section, the normative text and the documents provided. This is what an IATF third-party auditor asks to see first.

4.1 to 4.4.1.2
Context of the organization, QMS, process mapping, Product Safety (4.4.1.2), CSR identification
Context analysisQMS scopeProcess mappingProduct Safety procedureCSR identification
5.1 to 5.3
Leadership, quality policy (5.2), responsibilities and authorities (5.3), personnel responsibility
Quality policyRoles & responsibilitiesPersonnel responsibility policyEscalation procedure
6.1 to 6.3
Risk analysis (6.1.2.1), preventive actions (6.1.2.2), business continuity plan (6.1.2.3), quality objectives (6.2), management of change
Risks & opportunitiesPreventive action registerContingency planQuality objectivesManagement of change
7.1 to 7.3, 7.5
Competence & training (7.2.1), motivation (7.3.2), quality manual (7.5.1.1), document control (7.5), records retention (7.5.3.2.1)
Competence & training procedureSkills matrixMotivation procedureQuality manualDocument controlRecords retention policy
7.1.5
Monitoring and measuring resources, maintenance (TPM 8.5.1.5), calibration (7.1.5.2), alternative measurement methods (7.1.5.1.1)
TPM maintenance planMeasurement equipment managementCalibration procedureMaintenance & calibration recordsAlternative measurement methods
7.5.3.2.2
Customer engineering standards and specifications management, distribution, and implementation
Customer engineering standards procedureEngineering change distribution procedureCSR compliance matrix
8.1 to 8.2
Operational planning, customer requirements review (8.2.3), customer complaints, feasibility study, customer changes
Contract reviewCustomer complaints registerFeasibility studyCustomer change management
8.3.1 to 8.3.4
APQP (8.3.1.1), product and process design (8.3.3.2), special characteristics (8.3.3.3), software self-assessment (8.3.2.3), design review
APQP procedure (incl. Process Design)Product design & developmentSpecial characteristics KPC/KCCEmbedded software self-assessmentDesign review report
8.3.5 to 8.3.6
Design and process FMEA (AIAG-VDA), Action Priority, design change records (8.3.6)
FMEA procedure (AIAG-VDA)Design FMEA (DFMEA)Process FMEA (PFMEA)S/O/D rating grid + APDesign change records
8.4
Supplier selection (8.4.1.2), statutory/regulatory compliance (8.4.2.2), evaluation (8.4.2.4), second-party audit (8.4.2.4.1), SDP
Supplier selection & qualificationPanel & annual evaluationSecond-party audit checklistPurchasing regulatory complianceSupplier Development Program
8.5.1 to 8.5.3
Production and service (8.5.1), control plan (8.5.1.1), TPM, identification & traceability (8.5.2.1), customer property (8.5.3)
Control PlanProduction & service procedureStandardized work instructionsRun at RateLot identification & traceabilityCustomer property management
8.5.6
Production change control (8.5.6.1), customer approval, alternative control methods (8.5.6.1.1)
Production change controlCustomer change approvalAlternative control methods
8.3.4.4 & 8.7.1.1
PPAP, 18 elements, PSW form, checklist, deviations/concessions (8.7.1.1), re-submission
PPAP procedurePSW formPPAP checklistDeviations/concessionsPPAP re-submission
8.6 to 8.7
Release (8.6), NC management with customer notification (8.7.1.6, 8.7.1.7, 8.7.2), rework with disposition (8.7.1.4), repair with customer authorization (8.7.1.5), recalls
Product/service releaseNC management with customer notificationRework with dispositionRepair with customer authorizationRecall management (NHTSA-aligned)
9.1
Monitoring and measurement (9.1.1), SPC, capability studies, MSA, Gage R&R
SPC procedureCapability Cp/Cpk/Pp/PpkControl chartsMSA procedureGage R&R study
9.2 to 9.3
Internal audit (9.2, 9.2.2.1), Layered Process Audit, management review (9.3) with customer KPI action plan (9.3.3.1)
IATF internal audit programLPA procedureManagement review + CSR action plan
10.1 to 10.3 & Core Tools
Improvement: corrective actions (10.1), 8D problem-solving (10.2.3), error-proofing / Poka-Yoke (10.2.4), continual improvement (10.3.1), + 5 AIAG-VDA Core Tools (APQP, PPAP, FMEA, SPC, MSA)
8D procedureError-proofing / Poka-Yoke procedureContinual improvement procedure5 Core Tools manual + IATF ↔ ISO 9001 matrix
Not included
Documents specific to each customer project and each OEM, which must be drafted case by case by your project quality team, depending on the product and the target OEM
APQP project file (per product)Filled-in PPAP file (per part)Filled-in FMEA (per product/process)Filled-in Control Plan (per part)Integrated CSRs from target OEMDV/PV test resultsReal Gage R&R studies on your measurement equipment
§The IATF 16949, ISO 9001 and Core Tools correspondence is detailed in the MAN-002 manual delivered in the kit.

Technical compliance

The points an experienced IATF 16949 auditor checks.

What third-party and OEM auditors check first. The kit addresses them one by one.

Risk-based approach

Deployed in FMEA, control plan, contingency plan and management of change.

6.1.2.1

Control plan

Aligned with the process FMEA: special characteristics, control methods, frequencies, reaction plans.

8.5.1.1

AIAG-VDA FMEA

7-step method, Action Priority replaces RPN.

8.3.5

PPAP: 18 elements

From design record to PSW, with initial capability studies and MSA.

8.3.4.4

Layered Process Audit

Multi-level audits with managers, focused on critical quality points.

OEM CSRs

8D problem solving

8-discipline method, effectiveness checked at 30, 60 and 90 days.

10.2.3

Customer-specific requirements

Each automaker's CSRs integrated and tracked in a dedicated matrix.

4.3.2

Contingency plan

Supply disruption, key equipment failure, site loss, cyberattack, pandemic.

6.1.2.3

Product safety

Safety-related characteristics identified, enhanced traceability, management escalation.

4.4.1.2
IATF

IATF 16949: global recognition

The automotive quality management standard recognized by major manufacturers and required across their supply chain.

United StatesMexicoCanadaEuropeJapanSouth KoreaChina and IndiaBrazil and Latin America
IATF flash audit

Where do you stand today?

Answer the 12 section-by-section questions to get your IATF 16949 maturity score. Instant result, free, no personal information required.

Question 1 / 12
Section 4: Context
0
/ 100

Buy the IATF 16949 Package · $389
Deployment process

From order to certification audit, here is the route.

1
Day 1

Download

Full ZIP: 148 Word and Excel documents.

2
Weeks 1 to 6

Customization

Logo, org chart, processes, equipment, suppliers, target OEM CSRs.

3
Weeks 6 to 20

Implementation

Core Tools training, pilot APQP and PPAP, LPA, capability and R&R studies.

4
Weeks 20 to 28

Mock audit and certification

Internal audit with the kit's checklist, management review, then third-party audit.

Typical timeline: 6 to 9 months: 4 to 6 for a mature ISO 9001 site, 10 to 12 starting from scratch.
Need a hand? Our consultants can tailor the kit to your site and support the rollout, on quote.
Request a quote
They use the kit

What companies using the kit say.

★★★★★

The APQP and PPAP procedures spared us much of the writing. We had to adapt them to our lines and our customers' CSRs, but we prepared the third-party audit on a complete base.

M
Michael
Quality Manager · Tier 1 supplier, USA
★★★★★

The authors know automotive. The Core Tools manual and its IATF and ISO 9001 matrix guided my Stage 2 preparation.

C
Caroline
Quality Director · Component manufacturer, Canada
★★★★★

The kit saved us time on the writing. The 8D procedure was adopted with few changes, the field rollout remains our work.

R
Robert
Founder · Automotive metallurgy startup, UK
★★★★★

Excel forms easy to rework, FMEA aligned with the AIAG-VDA method. A few sheets to adjust to our process, nothing blocking.

S
Sebastian
Methods Manager · Automotive foundry Tier 2, Australia
Risk-free

30-day guarantee, no questions asked.

30-day money-back guarantee

You test the package. If you change your mind, we refund you.

You have 30 days to download the package, review its content, open the documents, and verify that the writing quality matches your expectations. If something is off, you write us an email, no justification needed, and the refund is processed within 5 business days. That simple.

Frequently asked questions

Answers to your most common questions.

Is the kit enough to get IATF 16949 certified?

No. It provides the documentation required by IATF 16949 and the Core Tools. Certification depends on implementation: APQP on a real project, PPAP, FMEA, capability, R&R, LPA.

Are the documents editable?

Yes. 98 Word files and 50 Excel files, no locked PDFs. Neutral layout, ready for your logo and references.

Does the kit cover OEM Customer-Specific Requirements?

It provides the method and a CSR compliance matrix by OEM. The CSRs themselves are distributed by each automaker to its suppliers.

Does the license cover several plants?

It covers one production site, with unlimited internal use. Multi-site groups or consulting firms: contact us for a suitable license.

When will I receive the files?

As soon as payment is confirmed: a link on the confirmation page and by email. Full ZIP, folders by document type.

What if the kit does not suit me?

You have 30 days to review it. Write to support@qse-academy.com explaining what does not meet your needs: the refund is issued to your original payment method, 4 to 5 business days after processing.

Take the next step

Your IATF 16949 automotive QMS. Ready today.

148 Word and Excel documents, instant download after payment.

Buy the kit · $389
30-day money-back guaranteeInstant download12 months of updates
IATF 16949:2016 documentation kit