FSSC 22000 V6 Internal Audits During Transition

New FSSC 22000 V6 Internal Audits During Transition
Food Safety

FSSC 22000 V6 Internal Audits During Transition

Your Best Tool for a Smooth FSSC 22000 V6 Transition

When organizations start preparing for FSSC 22000 V6, most focus on documents and training. But in my experience, what truly makes or breaks a transition is the internal audit.

Think of it as your “pre-certification rehearsal.” A solid internal audit not only checks your system’s compliance but also uncovers weak spots before the certification body does.

In this guide, I’ll walk you through how to plan, conduct, and use internal audits effectively during your transition from V5.1 to V6 — without turning it into a time-consuming paperwork marathon.

Why Internal Audits Matter More Than Ever in V6

An internal audit isn’t just about ticking a box — it’s how you prove that your system works under the new version.

FSSC 22000 V6 raises the bar with new expectations around food safety culture, environmental monitoring, and additional requirements. These areas can’t be verified through documents alone — they need evidence gathered through interviews, site checks, and data trends.

Here’s what I’ve noticed: companies that treat internal audits as performance reviews — not fault-finding sessions — transition faster and face fewer surprises during certification.

Pro Tip: Schedule your transition audit at least 60–90 days before your certification audit. That window gives you time to close gaps properly, not hurriedly.

Common Mistake: Running the same old internal audit checklist from V5.1. If it doesn’t cover food safety culture or the EMP, you’ll miss critical findings.

A food packaging client I worked with discovered this the hard way — they hadn’t included EMP in their internal audit. Their certification auditor did. The result? A major non-conformity that delayed their transition by two months.

FSSC 22000 V6 Internal Audits During TransitionKey FSSC 22000 V6 Updates That Impact Internal Auditing

The scope of your internal audit must now reflect all new and revised clauses. Here’s what changed:

  • Food Safety and Quality Culture: You’ll need to verify evidence of engagement — training, surveys, or metrics that track cultural maturity.
  • Environmental Monitoring Program (EMP): Check that sampling plans, test results, and corrective actions are documented and analyzed.
  • Food Fraud & Defense: Review the latest vulnerability assessments and mitigation plans for updates and validation.
  • PRP Programs: Confirm alignment with the relevant ISO/TS 22002 series and ensure maintenance, allergen control, and sanitation records are verified.
  • ISO 22003-1: 2022 Integration: Internal auditors must now consider updated rules for risk categories, audit duration, and auditor competence.

Pro Tip: Map each V6 clause directly into your internal audit checklist. You’ll instantly see whether you’re covering the entire new scope.

Building a Transition-Focused Internal Audit Plan

Before you start auditing, you’ll need a clear plan. Here’s a simple structure that works across sites and industries:

  1. Review your previous audit cycle (V5.1) — note recurring findings or unclosed actions.
  2. Identify new V6 requirements — especially those under Additional Requirements and ISO 22003-1.
  3. Prioritize by risk — EMP, allergens, and supplier management should be at the top of your list.
  4. Assign competent auditors — make sure they’ve been trained on V6 changes.
  5. Set realistic timelines — stagger audits to give teams time to correct issues.

Example: One beverage company I supported ran its transition audit in two phases — first a documentation review, then a plant-floor verification focused on V6 updates. It spread the workload and gave them a clearer picture of readiness.

Pro Tip: Use a simple matrix that links each internal audit finding to the corresponding V6 clause. It makes management review reporting much easier later.

Auditor Competence and Training in V6

Under FSSC 22000 V6, competence isn’t optional. Internal auditors must understand both the standard and how new clauses translate into real-world controls.

Focus training on:

  • Assessing food safety culture objectively.
  • Evaluating EMP effectiveness through trend analysis.
  • Reviewing root-cause analysis and CAPA closure accuracy.

Pro Tip: Keep all training certificates, sign-in sheets, and assessment records — certification auditors often ask to verify internal auditor competence.

Common Mistake: Assigning audits to supervisors who haven’t reviewed the latest version of ISO 22000 or ISO/TS 22002. It’s not just about experience — auditors need to interpret requirements, not just “check boxes.”

Conducting the Internal Audit: Practical Steps

Here’s a straightforward approach that works every time:

  1. Prepare — review updated procedures and your risk register.
  2. Execute — interview staff, inspect records, and verify on-floor practices.
  3. Evaluate — classify findings as major, minor, or observation.
  4. Report — document everything clearly and share results with management.
  5. Follow up — confirm corrective actions and verify effectiveness.

A sample audit table helps keep things organized:

Audit Area V6 Clause Finding Risk Level Owner Due Date
Food Safety Culture 2.5.1 KPI tracking inconsistent Medium HR Manager Jan 2025
EMP Program 2.5.4 No trend analysis of results High QA Supervisor Feb 2025

Pro Tip: Capture both positive and negative findings. Highlighting improvements shows auditors that your FSMS is maturing, not just maintaining compliance.

Turning Internal Audit Results into Continuous Improvement

A good internal audit doesn’t end with a report — it drives real change.

  • Review findings by risk and frequency to identify systemic issues.
  • Use results as input for management review meetings.
  • Validate corrective actions — make sure the same issue doesn’t reappear.

Example: One frozen-food producer used internal audit data to tighten allergen-cleaning validation. By the time their transition audit came, that area was listed as a “strength” by the certification auditor.

Pro Tip: Trend your internal audit findings over time. Seeing fewer repeats or faster closures is the clearest sign your system’s improving.

Digital Tools for Managing Internal Audits

Running audits manually works — but it’s not efficient during transition. Digital tools can make a big difference.

With a QMS platform or simple online tracker, you can:

  • Log findings and corrective actions in real time.
  • Send automatic reminders to responsible owners.
  • Generate trend graphs and management-review summaries instantly.

A client using QSE Academy’s internal-audit tracker cut their audit follow-up time by 40%. Everything — from scheduling to verification — was centralized and paperless.

FAQs

Q1. How early should we perform our first internal audit for FSSC 22000 V6?
At least three months before your transition audit. That gives you enough time to correct issues and confirm effectiveness.

Q2. Can we use our old internal audit checklist from V5.1?
Only after you update it to include V6 additions — especially EMP, food safety culture, and new PRP clarifications.

Q3. Do internal auditors need new qualifications under V6?
Yes. They must understand new requirements and show competence in evaluating risk-based thinking and continuous improvement principles.

Conclusion: Make Internal Audits Your Transition Advantage

A strong internal audit program is your best tool for a smooth transition to FSSC 22000 V6. It gives you visibility, builds confidence, and helps you catch issues before they become findings.

After guiding dozens of companies through transitions, I can tell you — those that prioritize internal audits always pass their transition audits on the first try.

If you’re getting ready for FSSC 22000 V6, download QSE Academy’s Internal-Audit Checklist or book a short consultation to review your audit program and make your transition audit-ready.