The document that decides clause 6.1 at your next audit is the risk register. Look at the date of the last row anyone changed in it. If you have to open the file to find out, you already know how the auditor will read it.
ISO 9001:2026 splits clause 6.1 in two, with risks on one side and opportunities on the other, and it adds two verbs: analyze and evaluate. Below you will find the text, what changed since 2015, and the register columns I recommend. I think the new opportunities tab is the easy part. The analysis and evaluation cells are where most findings will land, and that is where your effort should go. Where something is my opinion rather than the standard, I say so.
Questions about your own case? Leave them in the comments at the bottom of the article, we read and answer every one.
Let’s get into it.
ISO 9001:2026 risks and opportunities: the essentials in 30 seconds
The text of clause 6.1, subclause by subclause
I take the text in order. The vocabulary follows the standard; the practical advice is mine. ISO/TC 176/SC 2, the committee behind the standard, summarized the revision as bringing greater clarity around risks and opportunities in its announcement that ISO 9001:2026 was published on September 16, 2026.
Clause 6.1.1: four purposes for determining risks and opportunities
Clause 6.1.1 now has a title, Determining risks and opportunities. In 2015 it had none. It still starts from the issues of clause 4.1 and the requirements of clause 4.2, and it still asks you to determine the risks and opportunities you need to address for four purposes:
- Item a) gives assurance that the quality management system can achieve its intended results.
- Item b) prevents or reduces undesired effects.
- Item c) achieves continual improvement.
- Item d) enhances desirable effects.
Nothing new in substance. The order of the items moved, and the plain improvement of 2015 became continual improvement. Read item d) twice. Enhancing desirable effects is the most useful working definition of an opportunity you will find in the text, so keep it at hand when someone asks what belongs on the second tab.
Clause 6.1.2: actions to address risks, with three verbs
Its title is Actions to address risks, and it covers risks only. The organization must determine, analyze and evaluate the risks that can have an undesired effect on its ability to consistently provide conforming products and services and to enhance customer satisfaction. Then it plans the actions, how to integrate them into its processes, and how to evaluate their effectiveness.
The actions must be proportionate to the potential impact of the risks on the intended results of the quality management system. Two notes follow. The first is new: the risks you determine can include your ability to deliver conforming products and services during and after a disruption. The second lists the usual options for treating a risk, from avoiding it to retaining it by informed decision, and it already existed in 2015.
Clause 6.1.3: opportunities get their own subclause
This is the new subclause, titled Actions to address opportunities. The mechanics mirror 6.1.2: determine, analyze, evaluate, then plan the actions and how to check that they worked.
One nuance matters. Here the actions must be appropriate to the context of the organization and contribute to the intended results, rather than proportionate to an impact. The note gives examples: new practices, new products or services, new partnerships, emerging technologies, initiatives, and other actions that meet the current and changing needs of customers and other relevant interested parties.
That note mentions emerging technologies, and it is a note, not a requirement. Annex A.6.1.3 adds possible sources of opportunities, such as changes in market conditions, emerging technologies or regulatory requirements.
Clause 6.1 before and after: the 2015 and 2026 editions side by side
In 2015, clause 6.1 held two untitled subclauses. The first spotted threats and openings together. The second asked you to plan actions, proportionate to the impact on the conformity of products and services. Opportunities lived mostly in a note. The 2026 edition moves four things, and the Global ACI document that sets the certification transition lists the reorganization of 6.1 among the key changes in its ISO 9001:2026 transition requirements.
- The verbs: determine and plan becomes determine, analyze, evaluate, then plan. Clause 6.1 still requires no documented information, but a written record remains the simplest proof.
- The yardstick: impact is now judged against the intended results of the quality management system, no longer only against the delivered product. The risks in scope are those that can affect your ability to consistently provide conforming products and services and to enhance customer satisfaction, wording that 2015 used in 5.1.2 b) and that 2026 now writes into 6.1.2.
- The split: one subclause per notion. Annex A.6.1.1 states that risks and opportunities are distinct and can be determined and addressed through separate processes.
- Leadership: clause 5.1.1 k) asks top management to promote both the risk-based approach and the opportunity-based approach. Section 0.3.3 of the introduction is gone, and 0.3.1 now points to A.6.1.2 and A.6.1.3.
In my view, the verbs will cost the most hours. They will hurt most in companies whose risk table was built mainly for audit day. A list of risks with a score is a determination. It is not yet an analysis, and it is certainly not an evaluation.
Risks, clause 6.1.2
- You determine, analyze and evaluate each risk, then act on it.
- Actions are proportionate to the potential impact on intended results.
- Effectiveness is analyzed in 9.1.3 e) and reviewed in 9.3.2 g).
Opportunities, clause 6.1.3 (new)
- You determine, analyze and evaluate each opportunity, then act on it.
- Actions are appropriate to the context and contribute to intended results.
- Effectiveness is analyzed in 9.1.3 f) and reviewed in 9.3.2 h).
The rest of clause 6 also moved. Clause 6.3 grows from four to seven items for the planning of changes, and the overview of what changes in ISO 9001:2026, with the transition timeline puts those changes in context.
The ISO 9001:2026 risk register: six columns
Now the practical part. Most companies certified to the 2015 edition own a risk register: one tab, a few dozen rows, a score, sometimes an action column used for ideas. There is less to change than you fear, but not nothing.
I impose no method, and neither does the standard. What follows are columns that answer the words of the text and the question an auditor is most likely to ask about any row, which is how you evaluated it.
| Column | What goes in it | Clause it answers |
|---|---|---|
| Source | Where the risk comes from: an issue from 4.1, a requirement from 4.2, an audit finding. | 6.1.1 |
| Description | The risk in one sentence. | 6.1.2, determine |
| Analysis | Causes and effects on your ability to deliver conforming output. | 6.1.2, analyze |
| Evaluation | Its weight, explained in words against the intended results of the system. | 6.1.2, evaluate |
| Action | What is decided, who owns it, by when. | 6.1.2 a) and b) |
| Follow-up | Date of the last review and what it concluded. | 9.1.3 e), 9.3.2 g) |
You will notice there is no color column. That is deliberate. The cell that matters is the evaluation, because it explains why this event weighs on the results of your quality system. A number with no sentence next to it reads, to an auditor, like a tick in a grid.
The opportunities tab: five columns
For opportunities, I add a second tab in the same workbook. Annex A.6.1.1 allows separate processes, so separate files are possible too. I would only recommend them to companies that already have different owners for risks and for opportunities.
An issue from 4.1 or an expectation from 4.2, seen from its positive side. Annex A.6.1.3 suggests looking at market conditions, emerging technologies and regulatory requirements.
What the opportunity would bring, under which conditions, with which resources.
Your judgment on the desirable effect it would enhance, item d) of 6.1.1, and on how realistic it is in your context. Write it as a sentence, and keep the sentence short.
A new practice, a new product, a partnership: what you decide to launch, who answers for it, and the due date. Clause 6.1.3 requires actions appropriate to your context, and its note gives examples such as new practices, products and partnerships.
What you will measure to check the action worked, and when you will review it, which feeds 9.1.3 f) and 9.3.2 h).
How many rows? The ones you will actually follow. When an opportunity you take creates a risk, list it on both tabs. A new partnership is also a new dependency, and the second tab will not show that on its own.
If you would rather adapt templates than build the workbook yourself, the ISO 9001:2026 documentation package includes a risk procedure, a risk analysis and evaluation matrix, a disruption scenarios matrix, an opportunity procedure and an opportunities register, all numbered to the 2026 clauses.
Climate as a source of risk
Clause 4.1 carries a climate requirement in its main text: the organization must determine whether its issues arise from climate change. Determine whether, not prove that. Clause 4.2 adds a note saying that relevant interested parties can have requirements related to climate change.
Clause 6.1 starts from the issues of the context. If your context analysis finds a climate issue, such as a plant in a flood zone or a customer asking for emissions data, the risk goes on the risks tab. If it finds none, write that down with the reason. A small consulting firm may end up with one row on climate, or none, and a justified zero conforms.
Annex A.4.2 names three areas where climate expectations can weigh on interested party requirements: regulatory compliance, customer requirements and the organization’s own commitments. Our guide on how to define and manage interested parties shows how to capture those requirements in the first place.
Disruption risks: note 1 of clause 6.1.2 and your choices
Note 1 of 6.1.2 points at your ability to deliver conforming products and services during and after a disruption. Annex A.6.1.2 defines disruptive events as incidents with a negative impact on the planned delivery of products and services. Clause 8.2.1 e) asks you to inform customers about contingency measures where relevant, including possible supply disruptions. Three passages, and not one of them requires a business continuity plan.
What the standard expects fits in your register. Add one or more rows whose source is disruption: an IT outage, a single-source supplier shutting down, the long absence of the one person who knows a process. Each row gets an analysis, an evaluation and a decision. A continuity plan is a valid answer. So is a second qualified supplier. You choose the formality; the standard only asks the question.
Risks and opportunities in management review
The split carries on into clause 9, and that is where an auditor will look for it, because it leaves dated traces.
- Clause 9.1.3 e) and f) use data analysis to evaluate the effectiveness of actions on risks and, separately, on opportunities, where 2015 had a single item.
- Clause 9.3.2 g) and h) make those two effectiveness results separate inputs to management review, so they need two lines on the agenda.
- Clause 9.3.2 c) is a new input on changes in the needs and expectations of relevant interested parties, and that is how new rows enter the register.
The single line of 2015 is not wrong. It is incomplete, and a careful auditor will notice. For your first review under the 2026 edition, I suggest one page per tab. On the risks side, list the rows reviewed during the year, those whose evaluation changed, and those whose action did not hold. On the opportunities side, list the actions launched and what they produced, in dated sentences with written decisions.
Our earlier article on risks and opportunities in ISO 9001 risk management covers the 2015 logic, which still applies to how you identify risks in the first place.
What clause 6.1 does not require
Plenty will be sold to you in the name of clause 6.1. Here is what the text does not ask for.
What clause 6.1 asks
- Risks and opportunities determined from 4.1 and 4.2.
- Each one analyzed and evaluated.
- Actions planned, integrated into processes and checked for effectiveness.
- A reasoned answer on climate, even if it is no.
What it does not ask
- A formal risk management method or a documented risk process, per A.6.1.2; ISO 31000 is only cited for guidance.
- Two separate registers, since one file with two tabs respects A.6.1.1.
- A business continuity plan, a scoring scale or a heat map.
- A policy on artificial intelligence, which the text never mentions.
On scoring, the text is silent. In my reading, evaluation can be done in words, as long as the words relate to the intended results of the system. Clause 6.1 names no document at all. The register is simply your most convenient evidence. What changes in each clause, from 4 to 10, is set out in our ISO 9001:2026 requirements guide.
ISO 9001:2026 risks and opportunities: frequently asked questions
Does ISO 9001:2026 require two registers, one for risks and one for opportunities?+
No. Annex A.6.1.1 says risks and opportunities are distinct and can be determined and addressed through separate processes. Can, not must. One file with two tabs meets the text, provided each tab has its own analysis and evaluation columns.
Is my SWOT analysis enough for clause 6.1 in the 2026 edition?+
It covers the first verb, determine. It does not analyze, evaluate or plan any action. Keep the SWOT as a source for the register, not as the register itself, and treat the threats and opportunities it surfaces separately.
Does clause 6.1 impose a risk scoring method?+
No. Annex A.6.1.2 says the risk-based approach does not imply formal risk management methods or a documented risk management process. ISO 31000 is cited for guidance only. The text asks you to determine, analyze and evaluate, then plan actions proportionate to the potential impact on the intended results of the quality management system.
Do I need a business continuity plan for clause 6.1?+
No clause requires one. Note 1 of 6.1.2 mentions risks to your ability to deliver during and after a disruption, Annex A.6.1.2 defines disruptive events, and 8.2.1 e) asks you to inform customers about contingency measures. A continuity plan is one possible answer, not the only one.
What should my risk register say about climate change?+
Clause 4.1 asks you to determine whether your issues arise from climate change. If they do, the risk goes on the risks tab with its source, analysis and evaluation. If it is not, your context analysis says so and explains why. Both answers conform; no answer does not.
What will the auditor look for in management review for clause 6.1?+
Two separate inputs: 9.3.2 g) on the effectiveness of actions on risks and 9.3.2 h) on the effectiveness of actions on opportunities, both fed by the analysis in 9.1.3 e) and f). Expect a look at the new input c) as well, on changes in interested party needs and expectations.
Are the opportunities of 6.1.3 the same as the opportunities for improvement of 10.1?+
Not quite, in my reading. Clause 6.1.3 starts from the context to find opportunities worth taking. Clause 10.1, which merges the former 10.1 and 10.3, handles opportunities for improvement as part of continual improvement. Continual improvement is one of the four purposes in 6.1.1 c), so an opportunity from 6.1.3 can feed 10.1 without the two clauses becoming one.
One workbook, two tabs, three verbs, two lines in management review: if your register shows all of them with dated sentences, clause 6.1 is covered.
Sources
- ISO 9001:2026, Quality management systems, Requirements (French edition), ISO, September 2026: foreword, 0.3.1, 4.1, 4.2, 5.1.1, 6.1.1, 6.1.2, 6.1.3, 6.3, 8.2.1, 9.1.3, 9.3.2, 10.1, Annex A.4.2, A.6.1.1, A.6.1.2, A.6.1.3
- ISO 9001:2015, Quality management systems, Requirements, ISO, September 2015: 0.3.3, 5.1.1, 6.1.1, 6.1.2, 6.3, 9.1.3, 9.3.2, 10.1, 10.3
- ISO/TC 176/SC 2, ISO 9001:2026 has been released, September 28, 2026
- Global ACI-TECH-3-TR 2029-09-30 (M), Transition requirements for ISO 9001:2026, version 1.1, Global ACI, September 4, 2026
Hafsa J. is the founder of QSE Academy. She is an engineer specialized in the food and agricultural industry, with a master's degree in QHSE management and more than 12 years as a quality manager.
She has helped more than 15 companies implement ISO 9001, ISO 22000, ISO 22716 and GMP, for food producers, cosmetics manufacturers, laboratories and service companies.
At QSE Academy, she writes about ISO 9001, food safety standards and the conformity assessment standards ISO/IEC 17020, ISO/IEC 17065 and ISO/IEC 17021-1. Her rule: a quality system should be simple, useful and efficient.